建房最后10%的尾款,房子还没完工,builder就发invoice催钱。 但是并没有给我讲交房日期,也就是没有发notice of practical completion。
这样我可以先不付钱吧。。。。剩下的活牵涉到电灯,热水器,地毯,草坪。。不可能圣诞前完工的。
提前感谢各位懂行大佬
评论
不能给!
我每次盖房签合同都会留总房款的2.5%在retention account,一年后builder才能取走
评论
可以留点钱 拿到oc再给。
评论
坚决不付。付了傻了,就不好好弄,拖时间。有你好看
评论
以下付款形式仅供参考
10% deposit
10%Base
15%Frame
35%Lock–up
25%Fixing
Base
Depends on type of floor:
timber - concrete footings for the floor are poured and base brickwork is built to floor level
timber with no base brickwork - stumps, piers or columns are complete
suspended concrete slab - concrete footings are poured
concrete floor - floor is complete
floor put in after exterior walls and roof are constructed - concrete footings are poured
Frame
The frame is completed and approved by a building surveyor
Lock-up
External wall cladding and roof covering is fixed, the flooring is laid and external doors and external windows are fixed (even if those doors or windows are only temporary)
Fixing
All internal cladding, architraves, skirting, doors, built-in shelves, baths, basins, troughs, sinks, cabinets and cupboards are fitted and fixed in position
评论
还有这种事? 我都没有retention account
评论
付完了他们剩下的活拖着不干你一点办法都没有
评论
估计得根据合同规定来吧
评论
应该留一部分好一些
评论
交了人家不来了你怎么办?打两年官司再住新房吗?
话说这个不是应该银行和builder交接的吗? 难道LZ 土豪全款盖房没贷款?