5.0 SITE CLASSIFICATION
This site is classified as CLASS P in accordance with AS2870 – 2011.
Clause 1.3.3a: Abnormal Soil Moisture Conditions likely – Removal of existing dwelling or structures is likely to expose areas having significantly modified soil moisture regime.
Notwithstanding the CLASS P site classification, application of AS2870-2011 Standard Designs as per CLASS M is appropriate subject to, measures are taken which will provide normal moisture conditions within the construction envelope (see section 6.0)
Any SITE CUTTING or FILL PLACEMENT has the potential to alter areas of the site which may be affected by abnormal soil moisture conditions. It may also alter the site CLASSIFICATION and footing recommendations.
Where CUT or FILL works occur, this office must be supplied with accurate details to ensure that the SITE CLASSIFICATION and FOOTING ADVICE remain appropriate.
评论
结果是p级对吗
评论
Silty clay or soft clay
评论
那是好还是不好
评论
P=problem, 你说好不好
不用担心,无非地基cost多点
评论
P是最常见的,尤其是拆过旧房子的,没有几个不是p的。
这个不重要,关键是地的坡度大不大
评论
P不好啊,土受湿度,温度影响容易变形,不过house的基础很多都是这样的,要具体开挖后才能确定是否需要额外处理
评论
地平的。是要加盖,不是盖新房子
评论
第一段说基本就是P由于移除以前房屋所产生的房屋土壤的湿度变化,一般影响不是很大,第二段说房屋可以按照M级别的土壤来设计,但一般要考虑其它设计需要,比如说:树木,回填土,另外一般的cut/fill是不会影响土壤本身的reactivity的,由于基本上cut/fill的土都是就地取材的,一样属性的土壤。
评论
澳洲中文论坛热点
- 悉尼部份城铁将封闭一年,华人区受影响!只能乘巴士(组图)
- 据《逐日电讯报》报导,从明年年中开始,因为从Bankstown和Sydenham的城铁将因Metro South West革新名目而
- 联邦政客们具有多少房产?
- 据本月早些时分报导,绿党副首领、参议员Mehreen Faruqi已获准在Port Macquarie联系其房产并建造三栋投资联