州政府三周前宣布了Parramatta Light Rail的stage 1 在2018年动工,2023年开通,列出了下面的几个站。大家来发表一下这个对沿线的房子有没有可能rezone?
The stage 1 route was announced on 17 February 2017. The stage 1 route runs between Westmead and Carlingford via North Parrramatta, the Parramatta CBD, Camellia, Rydalmere, Dundas and Telopea. A list of sixteen provisional stops was released for the twelve kilometre route. The stops are:[27]
Interactive map of stage 1
Westmead
Westmead Hospital
Children’s Hospital
Cumberland Hospital
Factory Street
Fennell Street
Prince Alfred Square
Eat Street
Parramatta Square
Harris Street
Tramway Avenue
Camellia
Rydalmere
Dundas
Telopea
Carlingford
Land has been purchased for a maintenance and stabling facility, to be located east of Rosehill Racecourse. Trams will access the facility via a short branch line that uses the alignment of the disused Sandown heavy rail line.[28][29]
Construction for Stage 1 is expected to begin in 2018 and be completed by 2023. Services are expected to operate every 7.5 minutes throughout the day.[30]
评论
感觉轻轨可能要联通着火车大站或者CBD才能有价值?
评论
又不连CBD,如果能连上CBD,那就牛了。
澳洲中文论坛热点
- 悉尼部份城铁将封闭一年,华人区受影响!只能乘巴士(组图)
- 据《逐日电讯报》报导,从明年年中开始,因为从Bankstown和Sydenham的城铁将因Metro South West革新名目而
- 联邦政客们具有多少房产?
- 据本月早些时分报导,绿党副首领、参议员Mehreen Faruqi已获准在Port Macquarie联系其房产并建造三栋投资联