Please find here a list of the items that need to be completed for the Completion Bond appointment:
新房,我有一万保证金在卖地给我的公司那里,今天来检查以下项目,我很不理解为什么没空调和compost bin他们就不退保证金!这是哪里的规矩?求大家帮忙想办法!谢谢
- The home must be completed in accordance to Design Approved plans and conditions.
- Garage Door Profile – straight lines, no square or rectangular designs.
- Driveway complete (Exposed Aggregate finish or Plain Charcoal Coloured Concrete only)
- Letterbox completed and installed.
- All fencing complete – capped paling fence style, to the sides and rear of the home.
- Side gate complete – side gate to screen off hot water unit from the street (painted capped paling fence style or stained timber slat style)
- All outside lights need to be installed and attached to motion sensors – capped light points will not be accepted as complete.
- Rain Water Tank connected to all Toilets.
- Solar Hot Water System installed.
- Clothesline location indicated.
- Compost bin.
- Grey water connection to Ensuite shower plumbing – provision for future grey water tank connection by you.
- Low Energy or LED lighting throughout the home.
- Energy Monitoring Device.
- Cooling/Air conditioning installed to the home.
- Corner Fence (applicable to corner blocks):
· Design?
· Painted? (If timber)
- 2-Storey Homes – must have Eaves to ALL elevations of first floor roof.