澳洲澳洲房地产开发公司的规则

在澳大利亚生意种种




如题, 想了解一下在澳洲做房地产开发的经营方式。(不是房地产买卖中介)

知道论坛上都是牛人,如果正好遇到业内人士,请大致介绍一下。或者说可以去哪里查询资料。

谢谢


评论
资料?什么资料?

买地,找人申请DA,找人建。

DA下来后卖楼花,或者建好后卖现楼。

评论
什么资料?

Developers

Under the Home Building Act 1989, a developer is an individual or company or partnership on whose behalf residential building work was or is to be done:

    in a building or residential development where there are or will be four (4) or more dwellings owned by that individual, company or partnership; or
    in connection with a retirement village or accommodation designed for the disabled where all of the residential units are or will be owned by that individual, company or partnership.

A company that owns a building under a company title scheme is not a developer for the purposes of the Home Building Act 1989.

The builder is the individual, company or partnership that carries out the residential building work.
Residential building work

Residential building work is any work involved in the doing or the supervision or the co-ordination of the construction of (or alterations, repairs or additions to, or protective treatment of) a dwelling.

A dwelling (ie. house, terrace, villa, home unit, etc) includes:

    swimming pool or spa
    garage, shed, cupboards, driveway, fence, and
    various other structures prescribed by the regulations when they are constructed for use in conjunction with a dwelling.

A developer usually arranges for another party (licensed contractor) to do the residential building work.

The contractor (whether an individual, company or partnership) which carries out the building work is:

    responsible for the entire project
    subject to the licensing and insurance requirements of the Home Building Act.

Top of page
Caution to developers

A note of caution to developers who contract two or more parties:

    developers may contract one or more person/ company/ partnership to undertake part of a residential building project
    each person/ company/ partnership is only responsible for the work specified under their contracts
    if the developer contracts two or more parties to work on the same building project, the developer is supervising and co-ordinating the work; this means that they are taken to be undertaking residential building work under the title of ‘builder’ and take on responsibility for this role.

Example 1

Sometimes a developer may hire:

    a licensed builder to supervise the technical aspects of the building project, and
    other contractors to carry out various trade works in the building project.

The licensed builder is only responsible to supervise or do the part of work they are contracted to do and is not responsible for the work that the developer hired the other parties to do.
Example 2

A developer:

    contracts a variety of trade contractors to work a number of roles, or
    hires two contractors, where one contractor might do, say, excavation work as preparation for the foundations and another contractor does the construction work.

If the excavation work here is part of the entire residential building work project (eg. by being support work for permanent foundations, rather than a hole for temporary shoring) the developer who contracts the separate contractors to do the different parts could be seen as co-ordinating the whole project.

Important: Each situation should be considered on its own facts.

The developer who does the building work or co-ordinates other contractors who are doing the work becomes subject to the provisions of the Act as a ‘spec’ builder.

Top of page
‘Spec’ builders

A ‘spec’ builder is the general term for an individual, company or partnership who carries out residential building work on land that they own. The ‘spec’ builder is a licensed builder and therefore does not need to contract out the work, but can do their own residential building work.

The building work is speculative, meaning the property is generally intended to be sold at completion.

Regardless of their intention (to sell or keep the property for investment), the ‘spec’ builder must:

    arrange home warranty insurance on the proposed residential building work before starting the work
    attach the certificate of home warranty insurance to the contract for sale of the property.

If the home warranty insurance certificate is not attached to the contract for sale, the:

    ‘spec’ builder is committing an offence and may be subject to a penalty
    purchaser has the right to rescind the contract for sale before settlement.

Top of page
Developers’ responsibilities
Home warranty insurance

A developer needs to ensure that the builder has arranged home warranty insurance for each dwelling before work commences if they contract a builder (principal contractor) to:

    undertake the building work
    take responsibility for the entire project.

When selling the property within 6 years of completion of the work, the developer must give the certificate of home warranty insurance with the contract, to each purchaser of a dwelling.

It is an offence for a developer to enter into a contract for sale of land where residential building was done or is currently being done or is to be done on the developer's behalf unless the certificate of home warranty insurance provided by the builder is attached to the contract for sale - except in certain circumstances for 'off the plan' sales.

The purchaser has the right to cancel the contract before settlement if the certificate of home warranty insurance is not attached to the contract of sale. Certain circumstances, such as sale off-the-plan are exempt.

Important: Under the Home Building Act 1989 a home warranty insurance policy is not required to cover a developer on whose behalf residential building work is being done. This is reflected in all currently available home warranty insurance policies, where developers are a standard exclusion.

Developers should seek independent professional advice as to other measures available to them to minimise any loss as a result of the death, disappearance or insolvency of the builder they engage. Such measures might include requiring a builder to have some other appropriate insurance in place (e.g. principal nominated contractor insurance) or requiring a builder to provide an on-demand bank guarantee, letter of credit or performance bond/surety which can be presented for payment if there is a default under the building contract.
Engaging licensed contractors

From 29 April 2005, it has been an offence under the Home Building Act, for a developer to:

    knowingly employ an unlicensed contractor
    refuse to disclose to a building inspector the names and addresses of persons working on the site

Monetary penalties may be imposed for breaches of the legislation.  The Home Building Act provides for a maximum penalty of $22,000 for individuals and $110,000 for a corporation.

评论

不知道楼主到底要问什么问题。
做开发无非就是筹钱,买地,找builder,卖房.具体里面的学问大了,网上很难找到相关信息。

评论
看到其他人做的方式:做土地开发基本就是整理好你的资金链,银行贷款。找好项目,比如是打算做一些政府合作项目,还是单纯从私人手里买土地,地可以是生地或者熟地。如果连建造也自己做就去考执照。剩下的就是想尽一切办法最大化土地的价值。
州政府还支持一些卫星城的发展有些特别项目,并出台优惠政策,比如你如果是海外投资到当地的房地产开发,可以申请某些类别的移民。。。扯远了

评论
谢谢楼上几位的发言, 偶在澳洲已经有身份,不是为了移民需求.目前生活在墨尔本,所以大多情况下,会优先考虑在本土发展.

以前在国内有做房地产开发,不过在国外比较不同,不同背景,要求

在网上很难找到相关资料,一下子不知道在哪里入手.

评论


DA stand for what?

评论
取决于你要干多大的项目,需要的经验和做法都是不太一样的。
在澳洲,几十套以上的UNIT,自己投资,请别人建的华人有一些,60%以上有痛苦的经历,BUILDER太难应付而且贪婪,他们熟悉规则,你玩不过他们。不管是白鬼或黎巴嫩鬼,甚至中国BUILDERS。中国人builder做过大点项目的就那么几个,有些人也很黑心的。
想利润合理或者可以控制,就得雇人自己建,可是懂这种项目管理的中国人和刚刚说的中国人builder一样不多。
总之,找到合适的人才是硬道理。否则,如果不是你运气超好,就要搞的你焦头烂额,赔个底儿掉的也大把人在。

评论

这个看起来还挺概括的

评论
development approval

评论
development application?

评论
谢谢,应该就是这个

评论
兄弟
没有看到你的email, 是什么??

评论
楼主可以先开发个两三个town house的项目练练手

评论
development application is the right answer

评论
我也想借贴问问,这房产开发公司,能不能做投资移民的生意?因为有朋友要移民,想找生意做。

评论



AGENT NAME: BOWEN FAN MARN:0956021

2年不到 ---> 多年

2年不到 --->  几十个商业移民。  整个澳洲多少个商业移民? 几个做房地产可以移民的? 能做房地产的还做移民?

歪楼不要紧,做广告也凑合,可不能这么过份把无说成有把?

评论
兄弟如果没在澳洲房产行业的混过的话,兄弟你先做几个duplex熟悉一下吧,
这里面流程太多,不是一句,2句就能说得清的,





评论
一般都找当地人
       
       
       
       
       
       
       
       
       


评论
细节很多,条条框框也很多,如果你没有熟识各方面的可靠的contractor,建议找熟悉这个行业的人合作,或者去这个行业相关的公司打工混经验。最大的风险就是时间超时,品质出问题,预算超标,售价超低,导致本来一个很有利润的项目最后成了砸钱的项目。

评论
要是我就先买块地盖个2-3个house然后卖,unit这种风险太大了,这要多少资金啊

评论
船小好调头,2-3个house慢慢熬,不会亏太多吧

评论
自己买2块地盖2个双拼出去卖3个,要不要这么麻烦啊

评论

风险无处不在呀。

评论

做开发的?
澳洲中文论坛热点
悉尼部份城铁将封闭一年,华人区受影响!只能乘巴士(组图)
据《逐日电讯报》报导,从明年年中开始,因为从Bankstown和Sydenham的城铁将因Metro South West革新名目而
联邦政客们具有多少房产?
据本月早些时分报导,绿党副首领、参议员Mehreen Faruqi已获准在Port Macquarie联系其房产并建造三栋投资联

买生意,生意过户,过户律师,悉尼,生意买卖租约合同,解读合同,conveyancer,律师

生意种种

求Pos system推荐

澳大利亚经营小型餐馆 请问大家有推荐使用哪个Pos system吗? 先谢谢大家 评论 我曾经在开店前研究过各种POS系统,我简单的写几个供你参考。 POS一般分两种Cloud的和本地安装的系统。先说云端的 ...

生意种种

b2b服装类生意,怎么发掘这边的买家?

澳大利亚本人生意小白,表哥在国内做服装生意,自己开厂做的那种,主要做户外,运动类衣服,做贴牌的,甚至包括英超狼队的所有服装(球员,教练,球迷)。 他问我能不能有空帮忙发掘下 ...

生意种种

买卖生意信息哪里找

澳大利亚请问各位老板,现在经济不景气, 那些买卖生意的信息哪里看,类似邮局,彩票店,鸡店之类的。先谢谢了 评论 http://seekbusiness.com.au/ 评论 google搜一下啥卖生意网站都齐了,经济不好买 ...

生意种种

ABN增加经营范围

澳大利亚咨询 sole trader想要给自己的ABN增加经营范围要怎么搞? 另外有没有规定多久必须开始新增加的项目? 多谢指教。 评论 没人知道吗? 评论 澳洲就没有经营范围这个东西,只要合法,生 ...

生意种种

商场的中岛柜台一周要多少租金?

澳大利亚昨天问了布里斯班West End的一家商场,中岛柜台一周竟然要1500刀,我想卖这种机械拼装的礼品,大概100多刀一个,请教这么高的租金能赚钱吗?商场里卖二三十刀手机配件的柜台很多开 ...

生意种种

商业贷款利率。

澳大利亚有个仓库3年贷款合同到期了。现在银行只能做到7.3的利率。现在的商业贷款利率都这么高了吗? 评论 算合理,现在一般都是7%-7.5%。有些客户和标的可以适当打折。 商业贷款,银行一般 ...

生意种种

请教,制冰生意能赚钱吗?

澳大利亚一集装箱般大小的制冰机租用我投资房的土地做生意. 是前房东多年前租给那制冰机主人的.据说至今约有15年了. 疫情前每月租600,疫情中降为500至今. 最近,制冰机主人告知,他退休已 ...

生意种种

弱弱的问一下补习社生意值得买吗?

澳大利亚某平台看到有中介发华人区的补习社转让 租金4000一个月全包,说有65个座位,3+3租约? 售价八万,大家觉得怎样? 评论 作为生意关键看他有多少学生,最近两年的盈利状况吧,补习班 ...

生意种种

商场中的店铺一般每月多少租金

澳大利亚一个中型商场的一个大概150到200平的一个店铺,一般每月多少租金 (包括outgoing)? 评论 问的太笼统,没人能给出答案。我给你一个个人的案例,1. 中小型商场, 45平靠着 coles ,17000/月 ...

生意种种

询问一下续租流程

澳大利亚有前辈可以给下建议吗? 还有半年到期,和中介之前说了谈续租,她说房东旅游去了,一个月后又问,中介不回答,但让我店里门前改这个那个,还要重新刷油漆啥的。一直在问我进度 ...

生意种种

Motel 租房合同

澳大利亚最近看上个motel,各方面都满意,但是lease contract有些问题,每年涨幅是4%,而不是按照CPI。另外,每5年review租金的时候,如果第三方review的结果比前一年租金低的话,那么继续按前一年 ...